How much work can be done by 12 men in one hour?
Table of Contents
How much work can be done by 12 men in one hour?
12 men work for 8 hrs a day. So, work done by 12 men in 1 hour is (1/5)* (1/8) = 1/40. Now, work done by a man in an hour will be (1/40)/12 = 1/480. According to the question, the work is to be completed in 5 days by working for 10 hours a day.
How many days will it take 4 men to do work?
So 4 men working 10 hours a days can complete it in 480 man-day-hours/ (4*10 man-hours) = 12 days. Originally Answered: 12 men can do a piece of work in 5 days working 8 hours a day. How many days it will take 4 men to do the same work if they work for 10 hours a day? =Ans.
How many people will complete the work in 5 days?
12 men complete the work in 5 day, if working 8 hours/day. If working time increase by 2 hours/day. Then , how many worker need=? Let after increased 2 hours /day work may complete in 5 days. And given data is. M1= 12. D1= 5=D2. H1=8. H2=10. M2=? Approx 10 men are need.
How many days does it take to complete a job?
15 men take 20 days to complete a job working 8 hours a day. The number of hours a day should 20 men take to complete the job in 12 days: – Competoid.com 15 men take 20 days to complete a job working 8 hours a day. The number of hours a day should 20 men take to complete the job in 12 days:
How many men are required to complete the work in 8 days?
We can go with two approach. If 10 men can complete a work in 8 days so in one day 80 men will be required. So for half day 160 men will be required. 2. Simple equation method
How many people would it take to complete the job in 20 days?
So, to complete the job in 20 days working 5 hours a day will require: 4320/ (20*5) = 43.20 men. Since you cannot have 0.2 man, engage 44 men for 19 days, that is 44*19*5 = 4180 worker-day-hours are executed and on the 20th day have (4320–4180/1*5 = 140/5 = 28 workers.
How many days could A and B work at it together?
A can do a piece of work in 16 days, B in 10 days. A and B work at it together for 6 days and then C finishes it in 3 days, in how many days could C have done it alone?
https://www.youtube.com/watch?v=kD_mL3XL9_Q
How do you calculate work done in days?
Note: Work done is always considered to be equal to 1. If a person can do a piece of work in ‘n’ days/ hours then that person’s one day’s/ hour’s work = 1 / n If a person’s one day’s/ hour’s work = 1 / n , then he will complete then he will complete the work in ‘n’ days/ hours.